Railway Stations
Fairy Meadow, NSW December 2019 – August 2020

Fairy Meadow Station
Upgrade

Transport Access Program station upgrade for Degnan Constructions
Project Overview

Two lift towers to bridge level, built without interrupting live rail or commuters.

The Fairy Meadow Station upgrade and commuter carpark is part of the NSW Government initiative to improve accessibility within the Transport Access Program (TAP) by delivering accessible, modern, safe, and integrated transport infrastructure.

DAMCON was awarded the FRP concrete package and successfully worked near pedestrian traffic and live rail conditions without interrupting live rail and commuters.

Scope of Works

Station Works

  • Lift 01 — base, pit, walls, shaft and landing at bridge level
  • Lift 02 — base, pit, walls, shaft and landing at bridge level
  • Platform linkway slabs
  • Platform switchback ramp
  • Platform elevated access walkway
  • Platform stairs
  • Forecourt pavements
  • Disabled access ramps
  • Kerb and gutter
  • All concrete quality as per RMS QA specification B80
Project Facts
Client
Degnan Constructions
Sector
Railway Stations
Location
Fairy Meadow, NSW
Status
Completed
Duration
December 2019 – August 2020
Specification
RMS QA B80
Program
Transport Access Program